New answers tagged

0 votes

Why the control input for in the operating point is not considered in the control?

But in most examples of linear control design and gain scheduling, we see that what is produced in the feedback control design of the linear system is considered the control input and the trim input ...
AJN's user avatar
  • 1,039

Top 50 recent answers are included