Questions tagged [manufacturing-engineering]

Filter by
Sorted by
Tagged with
6
votes
3answers
266 views

How can the vendor be approved/disapproved based on validation test data?

The power requirement for a sub system is 5V +/- 10% @ 1A of current. A RFQ was issued and a prospect vendor was selected. A first article of inspection (FAIR) has been submitted which includes 15 ...