0
$\begingroup$

After how many days can concrete framework be removed? Do admixture chemicals like superplasticizer or accelerating admixtures allow early removal of concrete framework?

$\endgroup$
1
  • $\begingroup$ When the concrete is sufficiently cured. You will know if you remove too early :) $\endgroup$
    – Solar Mike
    Jan 29 at 9:08

2 Answers 2

1
$\begingroup$

You pour test cylinders with every batch of mix used. These are then tested in a compression tester. When the test cylinders are up to strength, you can remove the form work. An engineer needs to determine what strength is necessary. Yes, admixtures, temperature, water content, mix formula, and aggregate selection effect the strength-gain curve.

enter image description here enter image description here

There are also real-time Bluetooth systems with imbedded sensors so you can match temperatures.

$\endgroup$
1
$\begingroup$

The American Concrete Institute (ACI) is a source of standards in the US construction industry.

There is a guide which has been posted on the web: ACI Guide to Formwork for Concrete

enter image description here

Some portions of the Guide:

Engineer should specify minimum strength determined by testing.

admixture consideration

possible stripping times

$\endgroup$

Your Answer

By clicking “Post Your Answer”, you agree to our terms of service and acknowledge that you have read and understand our privacy policy and code of conduct.

Not the answer you're looking for? Browse other questions tagged or ask your own question.