Timeline for Why is this construction site pouring gravel over a wire mesh, and then covering it with dirt?
Current License: CC BY-SA 3.0
5 events
when toggle format | what | by | license | comment | |
---|---|---|---|---|---|
Jun 27, 2019 at 15:06 | comment | added | Rhodie | The ground reinforcing is done to improve the soil strength yon which the entire structure will rest. The geotechnical engineer probably recommends it due to the soil test results for liquid limit and soil structural strength. | |
Jan 5, 2018 at 2:42 | vote | accept | TylerH | ||
Jan 4, 2018 at 18:34 | answer | added | loogle1 | timeline score: 4 | |
Jan 4, 2018 at 16:57 | review | First posts | |||
Jan 4, 2018 at 23:45 | |||||
Jan 4, 2018 at 16:52 | history | asked | TylerH | CC BY-SA 3.0 |